Moses Engineering was initially hired by the University of Florida to produce a report that prioritized and estimated the construction cost for the replacement of all of the remaining oil filled medium voltage switches on campus. Many of these switches were aging, leaking, and/or had no available replacement parts. The report grouped the switches by priority such that each group of switches would become a UF Physical Plant Division Minor Project (
OwnerUniversity of Florida
Project Size$2.8 Million
ServicesDesign