Projects

Baptist Health Miami AHU-75 and AHU-80

Summary

This project was to redesign the Campus Wide HVAC Upgrades package and re-permit the project for Baptist Health South Florida. Specifically, the scope was to redesign Air Handler Replacements of AHU-75, 80 and 83. Moses Engineering re-surveyed the spaces involved in updating the existing HVAC conditions, and updated the HVAC design to reflect Florida Building Code 2017 Requirements and the latest FGI (2014) requirements.

OwnerBaptist Health South Florida

Project Size$1 Million

ServicesDesign





If You Need A Solution ... We Are Available For You

Contact Us