This Commissioning Plan has been developed for the Florida Department of Health Hardy Building 3rd Floor Renovation located in Jacksonville, Florida. The commissioning (Cx) process is an integrated set of activities intended to ensure that the project meets both the design goals and the owner’s operational requirements. An owner’s goals and objectives is what drives the project team. The value of Cx lies in its power to verify that those goals and objectives are met and that building systems perform as intended. The Cx Plan is a document that outlines the organization, schedule, allocation of resources, and documentation requirements of the Commissioning Process.
OwnerFlorida Department of Health
Project Size35,000 sqft.
ServicesDesign